Top five Cupola Panels installed after concrete beam and concrete legs poured.  (top of cupola consists of the five top dome panels lifted up to set on concrete legs.)

4th row of panels being installed in 34′ dome.  45′ dome in back ground.

An American Ingenuity geodesic dome home kit is purchased in kit form. If you do not have the time or do not want to perform the geodesic dome construction, Ai knows of an independent Specialist that can be hired to supervise your laborers or your contractor’s laborers for the kit assembly. Click on Kit Assembly Consultant to learn more about this service. Do-it-yourselfers (DIY) can assemble their dome kit by following the Assembly Manual and Building Plans and emailing or calling our office with questions. An Expanded Assembly Manual is now available with each new dome order.  However, those home owners who hire the Specialist say he saves them two to three weeks of labor costs.

To view pictures of the Dome Kit Assembly Process, view Dome Kit Assembly.

To view info giving Construction Overview, view Overview.  Ai’s geodesic home kit construction process consists of:

  • installation of foundation – standard foundation is concrete slab. Dome can be built on a basement, concrete platform/columns, etc. 
  • installing temporary wooden rib system  
  • placing rows of preconcreted panels with a hoisting mechanism
  • overlapping and locking the steel mesh from adjacent panels
  • filling the exterior seams with concrete (hand troweling special on site fiber concrete in two applications using a bonding agent between each layer and watering down all the prefabricated concrete around where you are working)  Specific concreting guidelines & concrete recipe are in the Assembly Manual.
  • concreting the entryways and dormers
  • framing in entryways and dormers, installing your locally purchased doors and windows
  • priming and painting of the dome exterior
  • completing of standard interior finishing phases: plumbing, electrical, framing and finishing of  interior walls, kitchen and bathroom fixtures, etc.
  • finishing the interior shell’s wall board

This advanced building system makes it easier to construct an American Ingenuity dome than a conventional house or a wooden dome. No exterior walls to frame, No roof trusses to set, No sheathing, tar paper, or shingles to apply, No soffits, exterior trim, insulation or siding to install.  

Q: Can I assemble the Dome Kit myself?
A:
About 40% of our clients assemble their own dome kit shell themselves. The Kit panels come marked with numbers and letters to match the Assembly Manual that goes with the Building Kit. The Building Plans also have elevation views with numbers and letters. However, those home owners who hire the Specialist say he saves them two to three weeks of labor costs.
 

If you do not have the time or do not want to assemble the dome shell kit, American Ingenuity can refer you to a Specialist.  He will travel to your construction site and supervise the kit assembly.  After the kit is assembled, complete the interior finishing or your contractor hires local conventional subs (plumbers, electricians, drywall finishers, framers, etc.) to complete the interior finishing and the installation of your locally purchased doors and windows.

Prior to the availability of this Kit Assembly Specialist/Consultant to supervise the dome kit assembly, our clients had to hire a contractor who generally had never assembled a dome before.  As a result the contractor would tend to over charge because he did not know how long it would take or what problems would arise.  The Kit Assembly Consultant can provide you with references from previous American Ingenuity Domes he has assembled so you can determine yourself that your building kit will be assembled correctly and in a timely fashion. This Consultant would work directly for you or your general contractor as an Independent Contractor.  The Consultant charges a daily rate plus travel from his home base to your job site and a return to his home base at the completion of the job. 

If you are interested in hiring the Kit Assembly Consultant, call our offices at 321-639-8777.

Using three to four good laborers and depending upon the size dome and type of hoisting mechanism you use, shell assembly to the stage of having one layer of concrete in the seams and on the building options (kit with two entryways and four dormers) can take from 9-16 days. Once you decide on your floor plan, we can estimate the number of days needed for your shell assembly (entryways and dormers take longer to install than triangles).  View Kit Assembly Consultant to learn more.

Q: How do I select a builder for my dome?
A:
Whether you are looking for a contractor to handle all the construction of your dome, or a sub contractor to handle only an individual job, it is best to make many contacts and choose the one with which you are most comfortable. View Builders to see a List of Builders/Subcontractors by State.

If you do not have the time or do not want to assemble the dome shell it, it is to your advantage to hire a local contractor that knows your area, have him use the Kit Assembly Consultant to supervise the dome shell kit assembly and have the local contractor hire conventional local subs to do the jobs; i.e. slab, plumbing, electrical, framing, cabinetry etc. To learn more about finishing, View Interior Finishing.

Based on our experience with building departments and slab subcontractors, no project ever starts on time. As a result at the point when you have the building permit and the slab is formed up and ready to be poured within a few weeks, we will determine which shell consultant is available.

CHOOSING A CONTRACTOR OR SUB-CONTRACTOR

Making a choice:

  • There are many considerations when selecting the contracting firm to build your new dome home. To help you make this important choice, find out all you can about contractors in your area.
  • The more you know, good or bad, the better prepared you will be for a project of this scale and complexity.
  • If you are building your dome yourself as an Owner-Builder, you will be operating as the contractor and accepting all those responsibilities. This will include making the choice of all the subcontractors who will be working on your dome, such as the electrician, carpenter, and plumber.
  • If you are building with a construction loan, your lender may require a written contract between you and a licensed contractor, binding both of you until the completion of the job.
  • Just like people, there are contractors of every type out there – honest and dishonest, good and not so good. If you take the time to be selective you can find one of the great.
  • While each contractor is reviewing your plans to arrive at an estimate for his work, you will be able to evaluate his nature and characteristics.
  • With a good and trustworthy contractor, this can be one of your most exciting and rewarding accomplishments.

What to look for:

A Contractor who:

Shows an interest in doing something unique

  • Has a positive attitude.
  • Is a creative thinker – he looks for solutions rather than complaining about problems.
  • Exhibits professionalism in his business.
  • Is organized in his work.
  • Displays neatness on his job sites.
  • Has a good credit history.
  • Research the experience of the contractor and talk to previous customers.
  • Visit his job sites.

What to look out for:

  • A contractor who promises too much, too quick, for too little.
  • A contractor who says, “Just trust me
  • A contractor who can’t supply you with names of previous satisfied customers, copies of insurance forms, a permanent business address, or occupational license numbers
  • If a contractor is a poor manager and about to go out of business, his credit with suppliers is one of the first places it will show up. Ask where he has credit accounts and call to see if he is in good standing with his suppliers.
  • If someone gets injured on your property during construction, you will most likely be held responsible for all expenses unless your contractor has Workman’s Compensation Insurance. Check to be sure that he does.

Where to look:

    • Scan through the yellow pages and their ads, making lots of calls.
    • Approach friends, family, business contacts, and people you work with for recommendations.
    • Question the building materials suppliers, eg. concrete delivery companies know of reliable subs for foundations.
    • Inquire of your building official if he has any suggestions.
    • Check with your Chamber of Commerce or Better Business Bureau.
    • Contact local chapters of trade organizations such as the National Association of Home Builders.
    • By reviewing as many prospects as you can over the phone, and through a process of elimination, you will be able to narrow the list to a few contractors to review your plans for a quote.

 

Q: What support is used to hold up the component panels until the dome kit is assembled?
A:
American Ingenuity Dome Building Kits are generally erected using a system to temporarily hold the panels in place until the all the seam concrete and options’ concrete has cured. The rib system is dismantled upon completion of the dome and the 2×4’s are recycled as part of the interior framing. Shorter 2×4’s can be used to frame the second floor perimeter knee wall. To learn more click on Rib.  Due to the complexity of cutting the 2×4’s to precise dimension, the drilling of holes in each end and the painting of the 2×4’s red, white or blue, Ai can do this for you and ship the 2×4’s on the truck with your dome kit. 

The Rib System is the preferable assembly method on all the dome sizes. The Rib System consists of using your own 2×4’s, bolts/nuts/washers purchased from Ai and steel hubs on loan from America Ingenuity to erect a free standing framework matching the geometry of the dome. Additional supports are used to support each hub.  With a Rib System in place, a man lift or crane or hoisting mechanism can be used to set the panels into place. Since the Rib System reflects the dome geometry, a panel cannot be inadvertently positioned incorrectly.

Once the two layers of concrete has cured in the seams, link, cupola and on the entryways and dormers & the entryways and dormers are framed in, the rib system is disassembled, the hubs are returned to American Ingenuity and the 2×4’s are recycled as interior framing. The approximate rental charge is $850 for the hubs to be kept for five months.  If the hubs are returned to us intact within the five month period the complete deposit is returned. Thereafter, we subtract $20 for each additional month the hubs are kept and return the deposit difference to the client.

Q: What will it cost per square foot for a completed dome home in my area?
A:
First of all you save money by buying the American Ingenuity dome shell kit versus buying and installing the materials for a regular stick built house shell (roof trusses, plywood, tarpaper, shingles, insulation, wall board, soffits, gutters, etc.). Our shell kit is typically one half less in cost than the shell cost of a regular stick built house or wood dome or monolithic dome. View Stick Built to learn more.

If you hire all the work done, the finished price per sq.ft. on the American Ingenuity dome home will be about the same price as a conventional house in your area less the shell savings. This is because all the interior items for the dome interior are standard conventional items. The dome interior items are the same as for a conventional house; framing, plumbing, electrical, doors, windows, flooring, stairs, kitchen cabinets, bathroom fixtures, lighting fixtures, fireplaces, elevators, etc.

But you end up with so much more with an American Ingenuity dome….greater energy efficiency, greater strength, no wood in the shell for termites to eat or to burn, no shingles to replace, etc.

The finished costs on the dome depends so much on where you live, what the labor costs are in your area and what price points you select for your windows, doors, cabinetry, flooring, lighting fixtures, etc. You can ask at your local hardware store or ask a local contractor what the finished price per square foot is running for a conventional house. This is basically what it will cost to finish the domes (if you do no labor yourselves), because everything in the interior is standard whether it is a conventional or dome house….plumbing, electrical, lighting fixtures, bathroom fixtures, flooring, kitchen cabinets, windows and doors, etc. is the same. Basically you end up with a super-energy efficient, super-strong home for about the same price as a conventional house less the shell savings. View Building to learn more.

What are builders charging per square foot to finish a conventional house in your neighborhood? For example a 48′ dome can have over 3,000 sq ft. The building kit with options is approx. $60,000. Here locally in central Florida a conventional house can be built for around $100 to $125 per sq.ft. So a 3,000 sq.ft home would cost about $300,000 to $375,000 to finish without the land, land development and utility hookups. Lenders typically want 25% to 35% down of the finished price of the dome. That means $75,000 to $131,000 down. Lenders will accept part of the equity you have in the land towards the down payment amount; but they usually want a large cash down payment.  How does that fit in with your budget?

 

Q: How long will it take to completely build my dome home?
A: If you do no work yourself and hire subcontractors to complete the dome, it will take about the same amount of time to finish the dome as a conventional house. However the result is a super strong, super energy efficient home.

Q: What basic items will I need to erect my building kit?
A:
Depending on the size dome, to set the panels in place and concrete the seams you will need: Mortar mixer (4-8 cubic foot capacity — NOT a cement mixer!), cement trowels, sand (14 to 16 cubic yards), Portland cement Type 1 (40-100 bags) amount varies due to  number of entryways and dormers in your home. shovels, 5 gallon buckets, wheelbarrows, 3/8” polypropylene rope 50’-100’, 25’ Tape Measure, ladders 16’ and 32’, 16d common nails, extra 2×4’s, scaffolding, rental of a boom crane, labor to install the cement in the seams. View Items not in the Kit to learn more.

Q: What type of hoisting mechanism or crane will I need and for how long?
A:
The panels are placed using a man lift or crane that is capable of lifting 300-400 pounds, 25 feet up and 25 feet out.  Rentals on transverse lifts also called Boom Lifts, Horizontal Boom Fork Lifts, Roofing Lifts, Shooters are available from national rental chains. The rental companies can be found in your local telephone book.

With a four to six person work crew (depends on dome size) and proper bracing of the panels, a 45′ dome can be assembled in about 14 days.  In most cases, total crane operating time can be about 7 days for a smaller dome. For larger domes it may be most cost effective to rent a hoisting mechanism for a month. Then you can use the mechanism to not only lift the panels but to lift the buckets of cement that will be used to concrete the seams between the panels and concrete the entryways and dormers.

View Specifications for the panel weights for each dome size. 

 PANEL LIFTING SPIKES

Four lifting spikes are purchased from American Ingenuity for $100.   These are used for lifting of the triangular dome panels and the riser panels. 

The following information is in the Assembly Manual and includes sketches.

When preparing a panel for lifting, first bend the reinforcing wire mesh up almost in a vertical position to make the insertion of the lifting spikes easier.  Also having the mesh bent up will allow the panel to be placed without entanglement of the adjacent panel mesh. 

The lifting spikes are to be inserted at the midway locations along the panel’s edges. 

Push or hammer them into the EPS foam just under the concrete layer.  They should be parallel to the outer surface of the concrete. 

For safety reasons it is important that the lifting spikes are placed within 6″ of the center of the panel side. 

The spikes should be inserted so that the attached chain links can most easily to be threaded through the reinforcing wire mesh. 

Enlarge the opening in the reinforcing wire mesh so that the attached chain can go toward the center of the concrete side without obstruction.

Connected chains that will support 3 times the weight of the panel to the spike chain.  We recommend that you use a closed loop connector that can not release if there is no tension on the chain. 

Connect the 3 chains together so that the convergence point will be at a distance from the panel concrete surface equal to half the distance (length) of a panel side.  The chains should converge with about 90 degrees (square) between the two chains when viewed perpendicular.

Adjustments to the length of the 3 chains will allow you to tilt a panel to be better aligned with the location where it will be placed.

Some deviation in the spike placement and the convergence point height is allowable if you take in consideration how the forces are affected and follow all cautions listed below.

If the chains converge close to the panel the chains will be pulling more against each other and less in the direction intended for lifting the panel.  Reducing the convergence height to ¼ of the distance between spikes doubles the chain tension. 

Increasing the convergence height causes the panel to hang lower, reducing the height you can lift the panel.  Also when any chain is near perpendicular to the panel there is a serious risk of the spike being pulled out while lifting.

CAUTION

Because there are numerous things that could allow the panel to fall while lifting.  In addition to the chains and their connection, a sudden jerk from the lifting device, slack in the lifting cable and human errors and other things can cause the panel to fall.

The only way to assure safety is to assume that the panel can fall at any time.  Anytime a panel is lifted Never allow anyone under the panel or within range of its possible impact.  Even after a panel is set in place and supported movement of other panels or supports could cause it to fall. 

Don’t consider a panel secure until it has been C-ringed and concreted on two sides to adjacent secure panels and all of the concrete had time to adequately harden.

Not being full time safety conscious could result in fatality consequences.

Once a panel has been placed into its position at the dome shell, the lifting irons can be pulled out of the panel’s edge with a couple of strong outward jerks to the 3-link chain tail at the end of the lifting irons.

Q: What kind of vapor barrier will my dome have?
A:
Approximately one quarter of the energy consumed by an air conditioner is used to extract water vapor from inside the house. Water vapor easily passes through most building materials and is readily swept into homes through joints, seams and through the attic. Our E.P.S. insulation provides a good vapor barrier and our building method provides an air tight home.  Due to this tightness, you will run exhaust fans to exhaust moisture or in colder climates use a Heat Recovery Ventilator to remove moistre.  To learve about HRV, please view HRV.  To learn more about E.P.S. as a vapor barrier view Vapor Barrier.

Q: How will the concrete in my dome withstand the effects of freezing temperatures?
A:
Concrete is an excellent and common building material in all temperate zones throughout the world. Concrete is only affected by freezing temperatures when it is porous and absorbs water. The richness and density of our concrete prevents water absorption which spoils the surface when it freezes. Our concrete is also formulated with an air entrainment admixture which further improves the freeze-thaw characteristics. The exterior paint is an additional seal to any water that could freeze inside the concrete.

So that the concrete you mix on-site has the same properties as the panel concrete, we ship those same concrete ingredients with the Building Kit….synthetic fibers, liquid admixtures and a bonding agent. The concrete recipe using Portland Cement, sand, and ingredients is in the Assembly Manual. These ingredients improve the concrete’s characteristics, create super toughness, extend durability, make concrete impervious to water, give higher tensile and compressive strength, provide elasticity for expansion, and improve freeze protection.

The following is why we ship synthetic fibers with our Building Kit. Fibers in concrete work to reduce the formation of shrinkage and cracks in concrete’s plastic state while helping to improve shatter resistance and reduce water migration. The result: tougher concrete. Synthetic fibers are used in the first layer of concrete but are not needed in the second layer.

The concrete  in your dome out performs other exteriors because of its specially developed formula. Because of its exceptional composition, it actually gains strength over the years. The exterior concrete on the prefabricated panels adheres directly to the steel mesh and EPS without the need of a bonding agent. The concrete is in excess of 3500 psi which is stronger than it needs to be.  Although on site, you apply a bonding agent between the two layers of concrete and onto each panel’s flat bonding ledges and sloping bonding ledges.

To apply concrete in the seams the temperature should be above freezing, preferably at least 60 degrees. Do not allow the newly mixed concrete to freeze for two to three days. If you use a concrete accelerator do not allow the concrete to freeze for 1 ½ to 2 days.

The following is why we ship a Bonding Agent with our Building Kit. Concrete, or a cement mixture, will not bond to a dry absorbent surface such as dry concrete. The reason is easy to understand when you examine the curing process of cement. When new concrete is applied over old, dry concrete the moisture from the new concrete will be absorbed by the dry concrete especially at the surface where they meet. When the new concrete is robbed of its moisture at the joining surface it will not cure properly and therefore will not bond.

Bonding agents are designed to improve the adhesion between layers of concrete by acting as a glue and coating and sealing the dry concrete to prevent it from robbing the moisture.

To assure that the 2nd layer of concrete placed in the seams bonds will with the concrete of the panels, you should:

  1. Wet the prefabrciated panels with water and allow them to soak up all the water they will.
  2. Apply bonding agent on the concrete at the edge of the panel and on any concrete that has been placed in the seam. Allow the bonding agent to set for 30 minutes before applying the second layer.
  3. Keep the newly applied concrete moist during the concrete hydration.  Keep the old concrete around the newly applied concrete wet.

There are two special features designed into the panel of your kit to improve the bond and strength of your dome:

  1. The panels have a ledge molded into the edge of the concrete where the seam concrete is most needed to bond. This ledge increases the bonding surface, thereby increasing the ultimate strength of the joint.
  2. The steel mesh which extends from the old concrete to the new concrete is a small mesh with compliments the effect of the fibers in securing the joint.

The weather and the mix of the concrete (amount of water, etc) will effect the curing time of the concrete. Usually by the time you place a complete row of panels and are ready to start the next row, the concrete has cured enough. Take a nail and if you can scratch the concrete it has not cured.  Do not apply another row of panels until the concrete has cured in the prior row.

Q: What type of interior finish is on the triangle and riser panels?
A:
It consists of Georgia Pacific 1/2″ DensArmor Plus Gypsum wallboard adhered to the E.P.S. insulation with wallboard adhesive. It employs fiberglass mat facing instead of paper on both sides of the board. The core is silicon treated gypsum providing excellent moisture resistance, fire resistance and adhesion properties. It isn’t even damaged by multiple immersions in water. It won’t harbor spores that create sick homes.

The glass mats embedded into the core on both faces, results in dimensional stability and prevents warping. The glass mat is encapsulated with a coating which reduces skin irritation from exposed glass fibers. The moisture-resistant inorganic core has superior mold, mildew and fire resistance. The 1/2 DensArmor showed no mold or mildew growth when tested per ASTM D 3273.  

The wallboard finishing includes applying joint compound and tape on the seams and painting the wall board or finish the seams with a mixture of cement and perlite. The cement recipe is in the Assembly Manual.

Q: How much weight will the second floor support?
A:
At least 40 pounds per square foot, the same as other houses. Ai can easily design for a more demanding load such as waterbeds, libraries, exercise rooms, whirlpool tubs, or spas.

Q: How is the second floor attached to the dome shell?
A:
Most often the second floor joists are set on top of the first floor walls, the same as in conventional framing. In areas where additional support is needed, or where there are no first floor walls, the floor may be hung from the dome shell by anchoring a 5/8″ threaded rod vertically into the concrete of a seam. One rod can hold 3,000 lbs. Because of the incredible strength of our dome we are able to use the shell to support the second floor.  The suspension rods and plates can be purchased from Ai.  These items are listed on a form called a Parts List which is one of the two pages in the American Ingenuity official Building Kit Order Form.

Q: Can I use steel studs and steel second floor joists in my American Ingenuity Dome?
A:
Yes, we can design your dome to utilize steel joist and steel studs by designing them into your Building Plans. There are many benefits in using steel framing over wood framing. Steel joists can span great distances; thus, larger rooms are possible because fewer supports are needed for the floor above. Durability is also a benefit. Unlike wood, steel framing will not rot, shrink, swell, split or warp; and because of its zinc coating, it will not rust. Steel framing is impervious to termites, rodents and is non-combustible. The environment benefits as well. Much of steel framing is made from recycled steel, and what little waste is leftover from construction can be recycled again. Also steel does not require pesticides or other toxic substances used to protect wood. Steel is priced competitively with wood and is easy to install; plywood flooring and wall board are attached with screws. Like our dome, steel studs are fire and termite resistant, affordable and earth friendly. A perfect match.

Ai does not recommend concrete second floors.

 

Ai can design your building plans for steel framing and second floor steel joists. However we do not supply any of these items with the building kit. Go to your yellow pages under Industrial Supplies or Wall Board Suppliers and you should find businesses that sell steel framing and steel joists.

 

Metal Framing:

  • If the first floor of the dome is concrete, there is an additional price for Ai to change the building plans to design with steel studs and joists for the second floor.
  • If the dome has a basement or raised first floor, it is an additional price to design basement studs and first floor joist with steel.
  • The cost of metal framing is slightly higher than wood. You should only use metal framing if your subcontractor has worked with it before.
  • Metal Framing is not more fire proof. In a fire it will deform quicker than wood.

Some of our dome plans are now designed to show the interior wall and floor framing utilizing steel studs and joists. There are many benefits in using steel framing over wood framing. Steel joists can span great distances; thus, larger rooms are possible because fewer supports are needed for the floor above. Durability is also a benefit. Unlike wood, steel framing will not rot, shrink, swell, split, or warp, and because of its zinc coating, it will not rust.

Steel framing is impervious to termites, rodents and is non-combustible. The environment benefits as well. Much of steel framing is made from recycled steel, and what little waste is left over from construction can be recycled again. Also, steel does not require pesticides or other toxic substances used to protect wood.

Steel is priced competitively with wood and is easy to install; plywood flooring and wallboard are attached with screws. Use metal framing only if the subcontractor doing your framing knows how to work with it. Metal framing is not necessarily more fire proof. In a fire the metal framing will deform quicker than wood will.

Please call our office at 321-639-8777 for additional cost for metal framing design in Building Plans:

Q: Can I install conventional doors and windows in the dome exterior? And where are they installed?
A:
Yes conventional doors and windows can be used in the dome. The doors and windows are installed under the entryways and dormers within 2×4 walls that you build on-site. View Window Sizes and Building Options for more info.

Q: How is the exterior wall within an entryway or dormer built?
A:
It is constructed on-site using typical 2×4 wood framing techniques allowing you to personalize an important part of your dome, including your choice of locally purchased standard doors and windows. Using your own custom design the entryway wall exterior finish may be stucco, siding, brick, rock, or any material you choose.  Prior to applying stucco, steel mesh is attached to 1″ thick EPS.  Conventional windows and doors are purchased locally to please your taste and budget. Be sure to use energy efficient windows with double glass and insulated doors. 

Ai’s past clients have told us how difficult and expensive it is to purchase steel mesh locally…small 15′ roll costs $15.  As a result, Ai can calculate how much 1/4″ x1/4″ or 1/2″x1/2″ steel mesh you will need for the exterior framed wall for each entryway and dormer and add the mesh to your Parts List at a reasonable cost per sq.ft.  Ai can also calculate how much 1″ EPS you will need for your entryways and dormers and add 4’x8′ sheets to your Parts List.

Q: How are the electric and plumbing lines installed in the wall of the dome shell?
A:
Almost all of the electrical and plumbing will be contained in the interior frame walls, in the same manner as conventional housing. To install electrical wiring in the exterior dome walls: simply cut a groove in the E.P.S. insulation and wall board and insert the wire. Fill the groove with spray foam and finish the area with joint compound and tape. To install electrical boxes, conduit, or plumbing pipes: cut the E.P.S. insulation and wall board slightly larger than needed, insert the box or pipe and fill in the opening with spray expanding foam. The spray foam will harden in about half an hour, holding the box or pipe secure. To learn more view Electrical and Plumbing.  Ai ships approximately 8 cans of expanding foam (20 ozs) with your kit along with a metal dispensing gun and one can of cleaner at no cost. The dispensing gun makes it so you do not have to use up the can all at once. 

Locally you can purchase small cans of spray foam that are dispensed with a plastic tube…which gets clogged, etc.  Ai’s clients save money by purchasing more cans of expanding foam from us…..this item can be added to your Parts List as well.

Q: How are plumbing vent pipes installed in the dome shell?
A:
The plumbing vent pipes can be routed sideways through the interior framing and can sometimes be joined together before they exit our dome. Where the vent pipe is to exit through the dome shell, all you need do is make a hole through the panel in the appropriate location, extend the pipe through, concrete back up against the pipe, caulk and paint. The plumbing vent pipes are sealed to our concrete dome with caulk, e.g. urethane or butyl rubber. A plumbing boot like the type used on shingled houses is not used. View Vent Pipes to learn more.

Q: Can the dome have a fireplace and how is a fireplace installed?
A:
Yes the dome can have a fireplace. We suggest that dome owners try to locate their fireplace toward the middle of the dome, rather than along the outside edge which would cause the flue to very high on the outside. This puts more of the flue pipe inside the house where it can radiate the heat. As long as the flue pipe is round, you simply bust a hole in the concrete, enlarge the hole in the foam so that you can replace the foam with 2” of fiberglass insulation, then concrete around the vent pipe, caulk and paint. Use a nonsilicon caulk like urethane or latex. A fireplace can be added to any dome. But it may affect the second floor framing, so the stock plan might need to be modified. View Fireplaces to learn more.

Q: How are domes connected together?
A:
Domes are linked at the entryways or door dormers. Our dome kits include a standard 4′ high riser wall allowing them to be linked together despite a difference in diameters. View Links to learn more.

Q: What is the link between the domes made of, etc.?
A:
Domes are connected together with a link. The link connects to the adjacent dome at entryways or door dormers. The thickness of the E.P.S. in a link is usually 7″ when it takes the place of an entryway and 3 1/2″ when it connects like a door dormer. The width of the link depends on the size of the domes and whether they are connected like an entryway or door dormer. The length of the link varies from 2 ft. to 10 ft. Because the riser wall is a standard 4′ high, all domes will match each other despite a difference in diameters.

You do not use or order an entryway or dormer at the locations where a link connects to either dome.  The cost of the link varies depending on its width and length. 

Link panels are not concreted or wrapped with steel mesh. The 7″ E.P.S. Link panels are precut but they will require custom trimming and custom fitting where they connect to the domes. After the E.P.S. panels are in place they get covered with steel mesh and then concrete is applied to the specified thickness.  Steel Mesh can be purchased from Ai.  Also you can order the link panels with wallboard adhered.

Q: Can I have balconies off the second floor?
A:
Yes, in a 36′ or larger dome can have up to five second door dormers. A door dormer is installed above a standard entryway and a railing built resulting in a balcony. In a 34’ dome, the second floor door dormer will only accept a 6’ door that is 24” wide. This size door is a special order at Home Depot, etc.  The 36’ or larger domes can accept a standard 6’8” door.

 

In order to walk on top of the entryway, at our factory Ai cuts a four inch deep trough in the top side of two of the entryway panels. On site during the assembly of the entryway, not only is the top of the entryway stuccoed but a rebar is laid in the trough and the trough is filled with concrete.

To install the posts to hold the balcony railings, drill and install concrete anchors into the top of the entryway and install concrete screws into the side of the door dormer. The top railing is bolted to a concrete seam on each side of the door dormer. The Building Plans have details explaining this.

Q: What type of paint should I use on the exterior of my dome?
A:
Ai recommends a two coats of good quality exterior concrete paint.Your dome can be painted in any of color, avoid darker shades. You purchase the paint locally.  The primer must say to be used on masory or concrete.

PAINT, GALLONS REQUIRED Based on 150 sq.ft. per gallon of coverage for each coat applied. The surface area refers to the exterior surface area.

Dome Size
22′ 25′ 27′ 30′ 34′ 40′ 45′ 48′
Surface
1,036 1,189 1,484 1,611 1,994 2,645 3,255 3,652
Gallons of Paint
7 8 10 11 14 18 22 25

Take the Exterior Surface Area and divide by 150 to determine an approximate number of gallons for each coat of paint for each size dome. Yes, the exterior surface is just the cement surface itself, and does not include the dormers or entryways. For each entryway add 220 sq.ft. for each window dormer add 30 sq. ft. for each door dormer add 50 sq.ft.

Typically the dome is repainted every 4-5 years, it depends on your personal preference. The sides of the dome can be painted using an extension ladder and paint roller on a pole. Yes you can walk on any of the domes. If you do not have a cupola you install an eye bolt in the top of the dome to tie a rope through. To paint the top of the dome you can stand on the dome with the rope tied to you.

Q: In most of the photographs the domes are painted white, how can I make the dome exterior more conventional?
A:
The following are some exterior appearance possibilities:

  • Install stone, cedar, or wood on the vertical walls around the doors and windows in the entryways and dormers.
  • Install a wooden deck off a second floor balcony. Or you could connect two second floor balconies by a continuous wood deck.
  • Paint the dome a warm tan or soft moss green color.
  • Landscape with trees around the dome. Or install trellis with roses, vines, etc. that can climb up to the second floor deck concealing the first floor of the dome.
  • Build a porch or deck off the first floor.
  • Install canopies off the top of the entryways and doors.

Q: Would you explain briefly what is involved in the assembly of my dome kit?
A:
By simply placing the component panels, interconnecting the steel mesh, and concreting the seams you complete the structural framework, the exterior finish, the insulation and most of the interior shell wall board for your home’s shell. View Construction Overview to learn more.

  • Foundation: Once you’ve chosen a home site, you may build your dome on a slab, raised wood floor, or basement foundation – or even on pilings if necessary.
  • Temporary Support System: During the kit assembly process, the panels of larger domes are held in place by a wooden support system. It is disassembled after the seam and building optionsare concreted. Much of the 2.4’s can be reused as interior wall framing. The system is erected with your 2×4’s and our steel hub kit, which is returned to us upon completion of the dome. On our smallest domes, a simpler radial support system can be used, in which each panel is braced by temporary supports. View Rib Support or Radial Support to learn more.
  • Panels: Following the detailed instructions in the “Assembly Manual”, four foot tall riser panels are anchored to rebars extending out of your prepared foundation. The riser walls are interconnected with subsequent rows of triangular panels. The steel mesh of adjacent panels is overlapped and hooked with C-rings (commonly called hog rings) The upper panels of larger domes need to be placed using an elementary hoisting system or small crane.
  • Seams: As the rows of panels are positioned; the seams are first half filled with the special fiber concrete mixed at the job site. Additives (synthetic fibers and liquid admixtures) supplied with your kit render the same formulation as the panel concrete. Once all the seams are half filled: you start at the top of the dome and come down the dome using the bonding agent and fiber concrete to fill the seams; you finish the seam tops by sponge rubbing them to match the sand texture of the prefinished panels. To vary the exterior appearance to your taste, the seam concrete can be shaped flat or rounded.
  • Openings: The openings for doors and windows are created by structural entryway and dormer panels. They are set in place, connected to the other panels, then finish stuccoed with a layer of our special formula concrete. The six panels that make up one entryway for a 30′ – 48′ dome, consist of 3 1/2″ EPS wrapped in steel mesh and are concreted on the bottom side. On site you cement the entryway seams, lip top and the top sides. The window and door dormer panels consist of 3 1/2″ EPS wrapped in steel mesh and are not concreted. On site you concrete the dormers.  Due to the width of the 22′ & 27′ garage entryway panels they consist of 3 1/2″ EPS not concreted and not wrapped with steel mesh.
  • Painting: After the final coat of seam concrete, additional sealing with two coats of good quality exterior concrete paint is applied.
  • Completion: After your kit is assembled; you have the freedom to finish your home as you desire. Your choice of standard windows and doors are installed within the dormers and entryways in a stud wall which can be finished in concrete, stone, or wood. To finish the shell interior wall board, fill the wall board seams with joint compound and tape. Then paint the shell wall board with 50/50 mixture of joint compount and paint. Or the wallboard seams can be finished with a mixture of cement and perlite with a jont compound skip trowelled over the wall board and then primed and painted.  Interior walls are constructed then finished to taste. The second floor joist rests on loading bearing first floor walls and or are suspended from the dome shell.
  • Assembly: This advanced building system makes it easier to construct an American Ingenuity dome than a conventional house or a wooden dome. No exterior walls to frame, No roof trusses to set, No sheathing, tarpaper, or shingles to apply, No soffits, exterior trim, insulation or siding to install.

Charts are Examples of Ai Dome Kits Shipped

For examples we are listing charts for a 34′ dome building kit shipped to a Florida site, a 48′ kit shipped to a Florida site and a 40′ kit shipped to Trinidad.  

The following three charts list the pricing for each dome kit and items associated with that kit’s building plans.  Ai’s philosophy is that each Buyer pays for only what is needed for their dome kit and what is needed to obtain a building permit.  Ai does not burden the price of the building kit with the price of the building plans, engineer seal on the plans or ResCheck Energy Reports.  Some building departments do not require that the plans be engineer sealed by an engineer licensed for your state and do not require an Energy Report;  therefore if not required those buyers only purchase the building plans and do not purchase a seal or energy report.

The finished price per sq. ft. a home can be built for is dependent upon house square footage size, finishings, state (location within the state), what building code is enforced, site preparation based on soil conditions and whether the dome is built by a local Contractor/Builder or is Owner Built.  Every area varies on what the finished price per sq.ft. is because labor costs, site development costs and building code requirements vary by area.

The Dome Building Kit’s Special Prefabricated panels fit on one semi-truck when insulation is standard R28.  Ai believes you SHOULD NOT PAY for another semi-truck’s shipping cost to have exterior doors, windows, kitchen cabinets, bathroom fixtures, flooring, etc. delivered. These items are conventional items which can be locally purchased after competitively shopping prices at Home Depot, Lowes, eBay, Craig’s List, etc.

 

  • In Florida all new home construction requires Building Plans be sealed by an engineer licensed in Florida and an Energy Report.  For this above Florida Buyer their plans were $993; Florida Engineer seal for 34’ dome on slab was $600; Florida Energy Report was $190 for total of $1,743.  If your building department does not require a licensed engineer for your state to seal your plans & does not require an energy report, you do not purchase those items. (FYI, Ai no longer completes Florida Energy Reports).
  • The total price for the 34′ Dome Kit & the Fl Engineer Sealed Plans  was $36,688.
  • The estimated finished price for this Florida 34′ dome which includes the total price of $43,881  but not including the land cost, utility hook up costs, driveway installation or site preparation is $135,792.  To calculate the finished price take the number of square feet in the dome plan times the finished cost per sq.ft. for your area.  In this case in Central Florida building costs are around $123 a sq.ft.  Their floor plan has 1,104 sq.ft. resulting in the $135,792.  FYI the costs for the land, site preparation, driveway installation and utility hook ups WILL BE THE SAME whether it is a dome or a conventional house being built.
  • Free Web Site To Calculate Finishing Costs For Your Area:   To view information on a free web site where you can look up finishing costs for a conventional home in your state and area, click on Calculating Square Footage Costs. This article also includes  a Construction Cost Estimate Report from building-cost  for a 1200 sq.ft. home in Melbourne, Florida.

    To view the floor plan layout for the 34′ dome, click on these pdfs.

Online Viewing – Opens in Browser
34′ Dome Plans 1st Floor
34′ Dome Plans 2nd Floor

The total price of the 34′ Dome Kit to a Florida site including Parts List Items, 2×4’s for temporary wooden support system, shipping, sales tax, shipping and steel hub deposit was $43,881.

The price can vary because:

1) your floor plan selection determines the type and number of entryways and dormers.  This dome had two entryways, one window dormer and one second floor door dormer resulting in Kit with Building Options pricing of $34,945.

2) the Buyer chose to purchase 135 precut, drilled & painted 2×4’s for the temporary wooden support system – price of $1,134.  If you choose to not purchase the 2×4’s and cut them on site then subtract $1,134 from the total above. (Once the kit is assembled, seams between the panels concreted and entryways and dormers concreted, the dome is self-supporting and the support system comes down.  There is no wood to interrupt the Aidome panels.

3) Their Parts List Items totaled $1,400.  Each floor plan varies as to how much of the second floor is installed. This determines the number of suspension rods, Simpson hangers for the second floor joists, etc. This buyer chose a floor plan design which had half of the second floor installed.  Therefore this Parts List total will be more if you have more of the second floor installed.  Once your plans are finished Ai will know the specific Parts List items required.  To view an article which describes the contents of Ai’s two page Order Form, click on Order Form Description.

4) This site was in Florida so state sales tax and surtax had to be paid of $2,249.  If your kit is shipping out of Florida you will not pay sales tax or surtax.

5) The $1,610 deposit for the steel hubs is refunded when the hubs are returned per the rental agreement.

6) Shipping cost for one semi-truck was $800.  If your site is outside of Florida then the shipping cost is based on the number of miles from our Rockledge Fl factory to your site. Currently that cost is $2.70 to $2.90 a mile.  Please call with your zip code and we can estimate shipping costs for one semi-truck.

    • In Florida all new home construction requires Building Plans be sealed by an engineer licensed in Florida and an Energy Report.  This Florida Buyer’s plans were on sale for $1,313; Florida Engineer seal for 48’ dome plans on slab is $600; Florida Energy Report for one dome on a slab is $190 for total of $2,063.  If your building department does not require a licensed engineer for your state to seal your plans & does not require an energy report, you do not purchase those items.
    • The total for the 48′ Dome Kit and the Fl Engineer Sealed Plans and Energy Report was $62,722.
    • The estimated finished price for this Florida 48′ dome which includes the pricing of $72,392 but not including the land cost, utility hook up costs, driveway installation or site preparation is $232,064.  To calculate the finished price take the number of square feet in the dome plan times the finished cost per sq.ft. for your area.  In this case the building costs are around $112 a sq.ft.  Their floor plan has 2,072 sq.ft. resulting in the estimated $232,064.  FYI,  the costs for the land, site preparation, driveway installation and utility hook ups WILL BE THE SAME whether it is a dome or a conventional house being built.
    • Free Web Site To Calculate Finishing Costs For Your Area:   To view information on a free web site where you can look up finishing costs for a conventional home in your state and area, click on Calculating Square Footage Costs. This article also includes  a Construction Cost Estimate Report from building-cost  for a 1200 sq.ft. home in Melbourne, Florida.
    • To view the floor plan layout for the 48′ dome, click on these pdfs.
Online Viewing – Opens in Browser
48′ Dome Plans 1st Floor
48′ Dome Plans 2nd Floor

The total price of the 48′ Dome Kit to a Florida site including custom two foot additional risers, Parts List Items, 2×4’s for support system, shipping,  hub deposit and sales tax was $72,392.

This price can vary because:

1) your floor plan selection determines the type and number of entryways and dormers.  This dome had two standard entryways, one High Profile entryway, two first floor window dormers, two second floor window dormers and one second floor door dormer and custom two foot risers; resulting in Kit with Building Options pricing of $60,689.  If your 48′ floor plan includes fewer entryways and dormers then the kit cost will be less.  If your 48′ floor plan has a greater number of entryways and dormers then the kit cost will be more.

2) Their Parts List Items totaled $2,251.  Each floor plan varies as to how much of the second floor is installed. This determines the number of suspension rods, Simpson hangers for the second floor joists, etc. This buyer had most of his second floor installed. Therefore if the plan you select has less of the second floor installed, your Parts List total will be less.  Once your plans are finished Ai will know the specific Parts List items required.  To view an article which describes the contents of Ai’s two page Order Form, click on Order Form Description.

3) the buyer chose to have ten foot tall ceiling heights in the first floor rooms that had a second floor installed above them.   As a result this added $2,809 to his kit price.  If you choose to not purchase taller risers then costs for additional risers will not be included in your kit.

4) the Buyer chose to purchase 135 precut, drilled & painted 2×4’s for the temporary wooden support system – price of $1,134.  If you choose to not purchase the 2×4’s but cut them on site then subtract $1,134 from the total above.

5) This site was in Florida so state sales tax and surtax had to be paid of $3,844.  If your kit is shipping out of Florida  no sales tax or surtax will be paid.

6) The $1,610 deposit for the steel hubs is refunded when the hubs are returned per the rental agreement.

7) Shipping cost for one semi-truck to their Florida site was $800.  If your site is outside of Florida then the shipping cost is based on the number of miles from our Rockledge Fl factory to your site.  Currently shipping cost is $2.70 a mile.   Please call with your zip code and we can estimate shipping costs for one semi-truck.

.

    • This Trinidad Buyer did not need an engineer seal on the building plans or an Energy Report to obtain a permit.  Therefore he purchased the building plans only.  His Plans were for a 40’ dome on a full basement. The dome and basement plans were $1,863.  If your building department requires a licensed engineer for your state to seal your plans & requires an energy report, then you purchase those items.  The seal cost for one dome on a slab is $600.  The seal for one dome on a basement is $900.  If stem wall is to be designed to get the footer below the frost line, add $200.  An Energy Report for one dome on a slab is $190; one dome on a basement $380.  If in California, hire a local company to complete California’s Title 24 Energy Report.  Ai will email them R value info and dimensions on the dome so they can complete the report. 
    • The total for the Dome Kit & the Building Plans was $46,405.  Total for all items was $52,802.  Shipping cost at the time was $4,531 for a total of  $57,333.
    • The estimated finished price for this Trinidad 40′ dome on a full basement which includes the $52,082 but not including the land cost, utility hook up costs, driveway installation or site preparation is $285,200.  To calculate the finished price take the number of square feet in the dome plan & basement plan times the finished price per sq.ft. for your area.  In this case the building costs are around $100 a sq.ft.  Their floor plan includes 1,420 sq.ft in the dome and 1,161 sq.ft. in the basement for a total of 2,581 sq.ft. resulting in the estimated $258,100.  FYI, the costs for the land, site preparation, driveway installation and utility hook up costs WILL BE THE SAME whether it is a dome or a conventional house being built.
    • Free Web Site To Calculate Finishing Costs For Your Area:   To view information on a free web site where you can look up finishing costs for a conventional home in your state and area, click on Calculating Square Footage Costs. This article also includes  a Construction Cost Estimate Report from building-cost  for a 1200 sq.ft. home in Melbourne, Florida.
    • To view the floor plan layout for the Trinidad dome, click on these pdfs

Trinidad Dome: The total price of the 40′ Dome Kit including Parts List, Rental of telescoping forklift to load the container, 2×4’s for support system and purchase of the steel hubs for the support system was $52,802.   The buyer paid the shipping cost directly to the shipping company.  

This price can vary because:

1) your floor plan selection determines the type and number of entryways and dormers.  This dome had three standard entryways, two first floor window dormers, two second floor window dormers and one second floor door dormer; resulting in Kit with Building Options pricing of $44,542. If your floor plan includes fewer entryways and dormers then the kit cost will be less.

2) Their Parts List Items totaled $2,193.   Each floor plan varies as to how much of the second floor is installed. This determines the number of suspension rods, Simpson hangers for the second floor joists, etc. This buyer had most of his second floor installed. If less of your 40′ dome second floor is installed, your Parts List total will be less.  Once your plans are finished Ai will know the specific Parts List items required.  To view an article which describes the contents of Ai’s two page Order Form, click on Order Form Description.

3) The Buyer chose to purchase 135 precut, drilled & painted 2×4’s for the temporary wooden support system – price of $1,134.  If you choose to cut them on site then subtract $1,134 from the total above.

4) the buyer paid $800 rental costs for telescoping forklift for Ai to load the container.  If the kit is shipped within the USA, the $800 rental will not be paid because Ai can load a flat bed truck with our fork lift.

5) Because the kit was shipping out of the United States it would be too expensive for the international buyer to ship the hubs back to Ai for a refund; therefore the buyer purchased the hubs for $2,070.  USA buyers place a deposit of $1,610 for the steel hubs. The deposit is refunded when the hubs are returned per the rental agreement.

6)  The buyer paid the shipping costs directly to the vessel line.  If your site is outside of Florida then the shipping cost is based on the number of miles from our Rockledge Fl factory to your site.  Shipping costs outside of Florida range from $2.70 to $2.90 per  mile. Please call with your zip code and we can estimate shipping costs for one semi-truck

 

Is the American Ingenuity (Ai) steel reinforced concrete geodesic dome kit  less expensive than the materials cost for the exterior walls and roof of a conventional house or wood dome or log cabin or monolithic concrete dome?  Yes.   American Ingenuity’s dome shell kit price (not the finished home cost) is about one third to one half less in cost than what the materials cost for the exterior walls and roof of a wood dome, gunited concrete dome or conventional house (exterior walls, roof trusses, plywood, tar paper, shingles, 3 1/2″ thick insulation, siding, soffits, gutters, drywall for exterior walls & the ceiling, etc.).

Calculating Finished Cost

The dome can be built and finished for about the same finished price per sq.ft. as a conventional house or business built in your neighborhood; however you receive more with the dome – greater energy efficiency, greater strength & fire resistant concrete exterior.  Each area of the country varies as to what construction workers and subcontractors charge per hour.   As a result check with a local builder to see what it costs per sq.ft. to build a moderately finished conventional house – Formica kitchen counter tops, no high end kitchens or high end bathrooms or high end flooring, etc. This is the approximate per sq.ft. finished cost the dome can be built for.

This means if it costs $110 a sq.ft to build a moderately finished conventional house in your neighborhood; then that is the approx. price per sq.ft. the dome can be built for.  For example if you built a three bedrooms/two bath size dome (40′ Theta 11 plan) with 1,521 sq.ft. for $110 a sq.ft. then the approx finished price is around $167,310.  This price includes the dome kit, kit assembly costs and labor and materials to finish the dome interior.  However it does not include 1) the price of the land; 2) driveway installation costs; 3) site development; 4) utilities – water, sewer or electric.  FYI, the costs for the land, site preparation, driveway and utility hooks will be the same whether it is a dome or a conventional house being built.

Because the American Ingenuity dome home is assembled from prefabricated panels, the kit can be assembled quicker; thus providing more savings over stick built houses, log cabins or pumped concrete domes.

Please compare apples to apples when trying to calculate finished cost of an American Ingenuity dome.  A conventional house would need walls greater than 2×10 with exterior reinforced with rebar and super thick concrete and still not come close to the advantages of an American Ingenuity dome.   A conventional house would need 11″ of fiberglass batting requiring over 10″ thick insulated walls (this is with our standard 7″ EPS R-28 value insulation) as well as additional roof strapping, rebar and concrete against storms, and still not be equal to one our structure’s insulation and strength. So please compare apples to apples!  Our kit comes with all the interior shell 1/2″ gypsum drywall installed, all the R28 insulation installed and 80% of the prefinished roof….and no wood to interrupt the insulation to rot, burn or be eaten by termites.  No shingles to blow off in high winds. Exterior concrete is primed and painted.

An Owner Builder or the dome owner’s builder can hire the independent  Kit Assembly Consultant to supervise their workers to get the dome kit assembled. Then conventional subcontractors frame in the doors and windows, prime & paint the dome exterior, complete the interior finishing – framing, electrical, plumbing, installing kitchen & bathroom fixtures & cabinets, drywall finishing, etc.

 

Materials Cost-Finished Cost

Total Materials Cost:  If you select standard items to finish the interior of your dome, the materials cost for your dome might be $50 or more per square foot. So the minimum materials cost (no labor costs) for a 40′ dome of 2,000 sq.ft. could be $100,000 (this includes the kit cost of $47,000).

Finished Cost of the house:  Finished price is more than the materials cost because it includes the labor costs plus the materials cost. So how does dome finishing costs compare to conventional house finishing costs?  If the finished price per square foot to build a conventional house in your area is $100 per square foot and you desire a 2,000 square foot house then the finished price for the conventional house would be about $200,000, if you do no labor yourself.  The finished price of the dome would be the same about $200,000 less the savings on the dome shell materials….. But you end up with more with the American Ingenuity dome. You receive a super-insulated, super-strong house whose exterior dome walls have 225 mph wind and F4 Tornado warranty. .To view summary of the advantages of Ai dome, please click on Summary.  To view info on cooling costs on 34′ dome home, please click on 1,075 sq.ft. home.

To view stock plan layouts for each size dome kit, click on Stock Plans.  To view the sale price of the building plans and dome kit, click on Plans & Kit Sale Pricing.  To view photos of finished pics of dome exteriors and interiors, click on Photos.  To view photos of Kit Assembly, click on Assembly.

Your interior materials cost varies depending on your selection of locally purchased interior items such as:

  • Formica kitchen counter tops versus granite
  • Oak kitchen cabinets versus cherry or mahogany
  • Vinyl flooring versus ceramic tile versus hard wood floors
  • Ceramic tile versus marble
  • Plastic shower stalls versus tiled showers
  • Plastic tubs versus Jacuzzi tubs
  • Jeld-wen windows versus Pella or Anderson windows
  • Standard light fixtures versus specialty
  • Standard kitchen appliances versus Thermador or Dacor appliances
  • Standard bathroom fixtures versus Aquaware or Boffi

A helpful web site is rsmeans.com It has construction manuals, construction estimating CD’s, etc.

Estimating Costs

The following information came from the book, The Complete Idiot’s Guide to Building Your Own Home by Dan Ramsey.

Can you afford to build the house you want? In Chapter 9 it states:  I’ll help you get a comprehensive estimate of your construction costs. For now, though, let’s make a rough estimate.  First, understand that whatever house you build will probably cost as much or more than that of your neighbors — unless you plan to do it all yourself. Based on this fact, let’s look at your neighbor’s houses.

As mentioned in Chapter 1, the typical house built today is about 2,300 square feet in size, and sells for around $225,000 depending on where you live. The actual price in your area may be half of that or 10 times that amount.

So, how can you get a good rule-of-thumb for your area? Of course, you can talk with contractors who will throw out numbers like $100 or $200 per square foot. That’s a wide range. What does it include? House only? House and land? Landscaping, too?

It’s smarter for you to get your own local building costs. Here’s how. Talk with a local real estate agent about new construction. It’s best if you can compare apples to apples, so ask about new homes and lots in the area you want to build. The agent should be able to tell you the lot cost, the asking price, and the square foot size of a few comparable homes. You can figure things from there.

You now have a base from which to guesstimate the approximate cost of your new house. Then you can factor in the following:

  • If you want a nicer view lot, add to the land costs.
  • If you will be your own general contractor, reduce the total by 10 to 20 percent.
  • If you will be a subcontractor, reduce the total by the sub’s fees.
  • If you want to enhance the design, tack on the additional costs or get a square-footage cost for better quality homes.

    American Ingenuity (Ai) – 8777 Holiday Springs Rd – Rockledge, Florida 32955

    321-639-8777 –  Mon-Fri 9-5 Eastern Time – GlendaB.Aidomes@gmail.com 

The following contains a photo gallery showing
the American Ingenuity’s Panelized Home Kit Assembly process.

(use arrows on right and left side of main picture to view other photos in the gallery.)

To view other pictures of panel assembly, go to  Construction Overview  and to Kaufman pics. To view the DVD for free, go to Free DVD.   To view engineering statement about American Ingenuity dome, go to Engineering.

An American Ingenuity geodesic dome panelized home kit is purchased in kit form. About 40% of Ai’s clients are owner builders while others hire a Contractor who hires the Kit Assembly Consultant.  The Component Panels, Building Plans and Assembly Manual come marked with panel nomenclature. If you do not want to manage the assemble of the dome kit, Ai knows of independent working consultants that travel around the country assembling the dome shell using your concrete workers or your contractor’s concrete workers. If you are on the east coast Ai knows of a Virginia builder who can be hired with his crew to construct an ICF basement and assemble the dome kit.  To view info on the independent Kit Assembly Consultant/Specialist, click on Consultant.

Due to spam filters your email requests may not make it to American Ingenuity and our email replies may not make it back to you.  If you email Ai and do not receive a reply in one to two days, please call us – 321-639-8777.  While you are on the phone, we will send you a test email and have you send your email to us.

First step after your foundation is in place is to install the first row of component panels, then assemble a temporary wooden rib system to install the rest of the panels on. Some form of lifting device is used to place the panels. By placing the component panels, locking the steel mesh from adjacent panels, concreting the seams and concreting the entryways, dormers, link, cupola, the structural framework, the exterior finish, the insulation and interior shell wall board are installed.

Once all the panels are in place, seam areas & entryways/dormers with two layers of fiber concrete,  the dome is self supporting & the wooden rib system is disassembled. Some of the wood from the rib system can be utilized for interior framing or for second floor perimeter knee wall.  There is no wood in or on the dome shell to rot, no wood to be eaten by termites, no wood to burn. No shingles to blow off in high winds.

The Consultant supervises the rib system assembly, panel placement and application of the first layer of concrete into the panel seams and onto the entryways and dormers. Fibers and liquid admixtures are shipped with each dome kit. In a mortar mixer fibers, liquid admixtures,Portland Cement, masonry sand and water are mixed to produce special mortar mix which is hand trowelled into the seam areas between panels and on to the entryway and dormer panels. 

Then either your workers or your builder’s workers complete the second layer of concrete in the seams & on the entryways and dormers. To learn more about selecting a builder, view Builders, Contractor & Determining Contractor Pricing.  For interior finishing complete yourself or hire local subcontractors to complete the plumbing, electrical, framing, window/door installation, wall board finishing, cabinetry, etc.

For waterproofing the concrete exterior, Ai dome owners recommend Ames Research Laboratories primer, tape and paint which can be purchased from ACE, True Value Hardware, Build-Rite Do It Center, etc/  Or call Ames at 888-345-0809 to purchase directly from them. For info on dealers in your area and their Super-Primer, Peel & Stick Contouring Tape and Maximum Stretch Paint click on  Ames.

The interior shell wall board is finished similar to conventional drywall. Or you can apply joint compound to the DensArmor Plus gypsum wallboard in what is sometimes called a skip trowel finish, apply primer and then paint. Or to cover any wall board imperfections and blend the wall board to the sanded joint compounded seams, mix a 50/50 batch of paint and dry powder joint compound.  Apply the mixture with a paint roller.

To view Ai’s new dome video, view on Dome Video.  The standard foundation for the Ai dome is an on grade concrete slab.  However the dome can be built on columns or pilings or a basement. Click on Foundation for more info. Call Ai for more foundation info, 321-639-8777.

To view assembly and finished pictures of a 45′ Ai dome built on a basement, view Stroupe Dome.  To view info about the rib system, click on Rib System.  To view a video showing panel assembly, click on Ulm 40′ Dome on Superior Wall Precast Concrete basement.

Electrical wiring is installed within interior framed walls, within some of the 1/2″ grooves between the interior shell wallboard and within grooves cut through the shell wallboard and EPS.  When wiring is inserted in the grooves, the grooves are filled with expanding foam and the area finished with tape and joint compound. Prime the DensArmor drywall and coat with 50/50 mixture of joint compound and paint. 

This advanced building system makes it easier to construct an American Ingenuity dome than a conventional house or a wooden dome.

  • No exterior walls to frame
  • No roof trusses to set
  • No sheathing, tarpaper, or shingles to apply
  • No soffits, exterior trim, insulation or siding to install.

A helpful book that gives you overall insight in building your own home is called The Complete Idiot’s Guide to Building Your Own Home by Dan Ramsey.  We also recommend that you visit your local library and research construction books which cover the concepts on building your own own.  A helpful web site is rsmeans.com.  It has construction manuals, construction estimating CD’s, etc.

Once you decide on your floor plan, use the info from the Kit Assembly Consultant to estimate number of days needed for that plans’ assembly.